Sewer Rate Schedule
Download 2024-2025 Rates
Effective 1/1/2025, 7/1/2025, and 7/1/2026 (Unless Otherwise Noted)
| Meter Size | 1/1/2025 Monthly Charge | 7/1/2025 Monthly Charge | 7/1/2026 Monthly Charge |
| 5/8 inch or 3/4 | $19.76 | $21.88 | $24.01 |
| 1.0 inch | $49.40 | $54.70 | $60.03 |
| 1.5 inch | $98.80 | $109.40 | $120.05 |
| 2.0 inch | $158.08 | $175.04 | $192.08 |
| 3.0 inch | $316.16 | $350.08 | $384.16 |
| 4.0 inch | $494.00 | $547.00 | $600.25 |
| 6.0 inch | $988.00 | $1094.00 | $1200.50 |
| 8.0 inch | $1,580.80 | $1,750.40 | $1,920.80 |
| 10.0 inch * | $2272.40 | $2516.20 | $2761.15 |
| Rate Code | Customer Class | Monthly Flow (CF) | Rate/100 CF |
| 4100 | Residential | All Billable Flow | $4.95 |
| 4200 | Commercial | All Billable Flow | $4.95 |
| 4201 | Industrial | All Billable Flow | $4.95 |
Note: For billing purposes, residential wastewater flow is capped at a maximum of 2,300 CF per month.
Monthly Sewer Flat Rate (No water meter)
| Rate Code | Customer Class | 1/1/2025 Monthly Charge | 7/1/2025 Monthly Charge | 7/1/2026 Monthly Charge |
| 4110 | Residential | $50.36 | $52.48 | $54.61 |
Assumes a 5/8" or 3/4" meter plus 600 CF of monthly flow.
PLUS:
Sewer Viability Charge:
| Rate Code | Customer Class | Monthly Flow (CF) | Rate/100 CF |
| 4100 | Residential | All Billable Flow | $0.15 |
| 4200 | Commercial | All Billable Flow | $0.15 |
| 4201 | Industrial | All Billable Flow | $0.15 |
PLUS:
Allocated Capacity Charge Effective 1/1/2025, 7/1/2025, and 7/1/2026
(Unless Otherwise Noted)
| Customer Class | Allocated or Purchased REUs | 1/1/25 Monthly Rate | 7/1/25 Monthly Rate | 7/1/26 Monthly Rate |
| Commercial | Over 1 | $2.93 | $3.02 | $3.11 |
| Industrial | Over 1 | $3.31 | $3.51 | $3.72 |
PLUS:
Additional Excessive Use Charge
| Customer Class | Monthly Flow | Current Rate / 100 CF |
| Commercial | Billable Flow in excess of REUs allocated or purchased | $3.95 |
| Industrial | Billable Flow in excess of REUs allocated or purchased | $3.95 |
Impact Fee Rate: $2,300.00 through 6/30/25
Rate effective 7/1/25: $2,500.00 (Formerly named: Capacity Fee and Availability Fee)
All new connections to the system shall be subject to an Impact Fee. Impact Fees, also referred to as privilege fees, infrastructure fees, availability or capacity fees, are a method of partially financing new wastewater treatment facilities and wastewater trunkline extensions in areas of substantial growth. The cost of these improvements is shared proportionately by new users. Impact Fees vary and are proportional to the expected volume of wastewater discharge. These charges are determined individually by the District’s staff at a rate of $2,500.00 per REU (Residential Equivalent Unit), which is defined as a discharge of 300 gallons per day. Expected discharge volumes of greater than 300 gallons per day are calculated at the same rate of $2,500 per 300 gallons per day. The minimum Impact Fee is $2,500.00
Connection Fee
(Formerly named: Tap Fee or Transmission Fee)
All new connections to the system shall be subject to a Connection Fee of $1,100.00
Inspection Fee
Inspection fees for new construction and abandonments District-wide $125.00
All low-pressure Pump Inspections District-wide $250.00
Re-Inspection Fee District-wide additional $150.00
(New connections, abandonments, low pressure pumps)
Low Pressure Pump Maintenance Fee
(Formerly named: Grinder Pump Fee)
| Rate Code | Customer Class | Monthly Flow (CF) | 7/1/2025 Monthly Charge | 7/1/2026 Monthly Charge |
| 701 | Residential | All low pressure pump maintenance | $19.98 | $20.79 |
Pretreatment Surcharge Rate Schedule
For all users who discharge wastewater in excess of domestic strength. The surcharge billing is based upon the number of pounds of BOD5 (five-day biochemical oxygen demand) and the number of pounds of TSS (total suspended solids) above specified maximum concentration (300 ppm BOD5 and 300 ppm suspended solids).
Similarly, the surcharge billing will apply for oil and grease for concentrations above 100 ppm.
| Surcharge Rates: | $0.552 | 301-900 mg/l per pound BOD5 |
| $0.828 | 901-1200 mg/l per pound BOD5 | |
| $1.106 | 1200 + mg/l per pound BOD5 | |
| $0.424 | per pound TSS | |
| $0.289 | per pound Oil & Grease |
CF: Cubic Feet
REU: Residential Equivalent Unit
Video Inspection Fee
For existing service as requested by customer in response to a private sewer service emergency request District-wide
Each Occurence
Current $325.00
CCTV Inspection/Reinspection
For new sewer system development.
$1.69 per linear foot. Each Occurence
Effective Date: January 1, 2025
Project Inspection
$1000.00 Inspection and Initial test. $100.00 each additional inspection/retest.
Effective Date: January 1, 2025
Lift Station Inspection
$2800.00 Initial and One Follow Up Review
Effective Date: January 1, 2025
Septic Tank Waste
In-District septic tank waste received from approved septage tank haulers at Wilson Creek WWTP
Per truckload delivered $195.00
Effective Date: April 1, 2023
Plan Review Fees |
||
| Project Plan Review | Initial and One Follow-Up Review | $500.00 |
| Additional Project Plan Review | Per Review | $100.00 |
| Phase Modification | After Plan Approval per modification | $250.00 |
| Lift Station Review | Per Review | $800.00 |
Effective Date: January 1, 2025